8
SZA 28 B2
GB
IE
CY
DANGER
►
When drilling the holes ensure that any electric cables or other installa-
tions in the wall, such as water pipes, are not damaged.
NOTE
►
When mounting on a wall, the reception quality should be tested
beforehand as the indoor aerial can no longer be re-aligned to
improve reception once it has been mounted.
♦ Use a pencil and spirit level to make a vertical or horizontal line on the
wall.
♦ Mark the position for the two necessary drill holes (8 cm apart) on the
line with the help of the wall mount
7
and drill two holes for the supplied
wall plugs (6 mm).
♦ Place the wall plugs in the drillholes and screw in the screws until they
project about 5 mm out of the wall.
♦ Place the wall mount
7
in the holes designed for this purpose on the rear
of the device (see Fig. C) and click it into place.
Fig. C
♦ Hang the indoor aerial on the screw heads and check that it sits fi rmly.
7
IB_93403_SZA28B2_GB_IE_CY.indb 8IB_93403_SZA28B2_GB_IE_CY.indb 8 05.12.13 11:3805.12.13 11:38
Comments to this Manuals